Boiler air and flue gas system equipment falls into the category of large, irregularly shaped heavy‑lift cargoes, encompassing air preheaters, economizers, flue/air ducts, steel structural frames, and other components. Individual pieces are bulky and have varied shapes, making transport operations challenging.
Bulky dimensions: some flue duct cross‑sections can reach several metres in size, and air preheater rotors are individually overweight, requiring low‑bed trailers or multi‑axle trailers. Dimensional drawings must be submitted in advance for booking.
Diverse and irregular structures: there are many irregularly shaped items such as elbows, reducers, and expansion joints, requiring customised stowage and securing plans for each piece.
Thin‑walled structures are prone to deformation: duct wall plates are relatively thin; improper selection of load‑bearing points can cause local denting, requiring high levels of protection.
Strict surface treatment requirements: anti‑corrosion coatings and lining materials are vulnerable to impact and scratching, requiring isolation protection during transport.
Complex component matching: a single project's air and flue gas system includes dozens of component types, requiring coordinated port consolidation, sequential packing, and careful checking to avoid omissions or mis‑shipments.
JYC Supply Chain: Providing a Comprehensive Integrated Logistics Service System
JYC handles a full range of equipment types, including air preheaters, economizers, flue ducts, air ducts, expansion joints, steel structural frames, chimney inner liners, and other complete boiler air and flue gas system equipment. Based on individual piece weight and dimensions, we match the appropriate transport solution and manage the entire process from port consolidation to shipment.
Domestic pick‑up → solution planning + container / breakbulk vessel matching → lashing and securing → port delivery → ocean freight booking → destination delivery
Step 1: Domestic Inland Transport
Clients may either arrange delivery to our designated port consolidation yard themselves or authorise us to provide door‑to‑door pick‑up. We operate a fleet of low‑bed trailers and multi‑axle trailers covering major boiler manufacturing bases nationwide. Based on cargo dimensions, we deploy the appropriate vehicle to ensure safe delivery to the consolidation yard.
Step 2: Solution Planning + Vessel Type Matching
Based on cargo dimensions, weight, and batch quantity, we select the most suitable vessel type (breakbulk / general cargo vessel, heavy‑lift vessel, or container vessel) and develop a stowage plan to ensure rational placement of irregularly shaped items and the complete shipment of all system components.
Step 3: Lashing and Securing
All operations comply with shipping line requirements and industry standards.
Our lashing solution:
Large items such as steel structural frames and flue/air ducts are symmetrically secured with steel wire ropes and tensioners, with tension adjusted to meet the requirements of the intended voyage area.
Thin‑walled flue/air ducts are supported at the bottom with timber sleepers or steel supports to distribute weight and prevent local deformation.
Irregularly shaped items such as elbows and reducers are individually supported, with additional lateral lashings to prevent rolling or overturning.
Flexible components such as expansion joints and compensators are individually packed to avoid compression deformation.
Components with linings or coatings are wrapped with stretch film or rust‑preventive paper to protect against marine salt spray and impact.
Components of the same type are stowed together and clearly numbered and labelled for easy sorting at the destination.
After the entire vessel is lashed, photographs are taken for documentation, and a lashing inspection certificate is issued.
Step 4: Port Operations
We submit the heavy‑lift operation plan to the terminal in advance, coordinate lifting and handling equipment (cranes, etc.) to ensure smooth delivery of the cargo to the port. Dedicated supervisors oversee the loading, re‑inspect the lashing condition, and only after confirmation arrange for vessel loading. We also cooperate with customs inspections and assist with clearance procedures.
Step 5: Ocean Freight Booking
Based on cargo dimensions, weight, and destination port, we select the most suitable vessel type and route, prioritising shipping lines with proven experience in heavy‑lift transport. Our main cooperating vessel types include: breakbulk / general cargo vessels, multi‑purpose vessels, and heavy‑lift vessels. We cover major ports from China to Southeast Asia, the Middle East, Africa, South America, and Europe. We also provide recommendations for marine insurance solutions.
Step 6: Destination Delivery
We notify the consignee in advance of the voyage schedule and estimated time of arrival, assist with discharging and customs clearance at the destination port, and coordinate local transport resources for last‑mile delivery. Throughout the process, we provide full tracking of all logistics milestones and keep you updated with real‑time transport status.